The answer is a foundation ! consisting of 80+ cubic yards of concrete. You can see the trucks stacked up on the road waiting their turn at the pump truck to fill the walls with concrete.
Unfortunately, Driver 1291 is not as happy as the other drivers. It is the Friday of the Labor day weekend and he is truck number 9 and .... he has broken down just 250 yards from the pump truck. There was 45 minutes left before the load was too hard to use and the repair truck was 5 minutes away when I had to leave to get to Bolder. As Paul Harvey would say, tomorrow "the rest of the story."